--- document_id: KC-PRO-GOV-001 title: Policy Review and Retirement Procedure document_type: Procedure domain: Governance version: 1.0 status: Active owner: Business Owner reviewers: - Operations Staff approver: Business Owner effective_date: 2026-04-03 next_review_date: 2027-04-03 supersedes: None related_documents: - KC-POL-GOV-001 related_systems: - Policy Repository - Forgejo Git - Compliance Evidence Repository retention_period: 3 years confidentiality: Internal --- # Purpose This procedure defines the steps used to review active controlled documents and to retire documents that are superseded, obsolete, or no longer applicable. # Scope This procedure applies to all controlled documents maintained under the Kell Creations policy repository structure. # Preconditions Before starting this procedure, the following should exist: - the target document is identified - the current version is available in the repository - the owner and approver are known - supporting review or retirement rationale is available # Procedure Steps ## A. Periodic Review Process ### 1. Identify review candidate Identify a document for review using one or more of the following: - scheduled review date - business process change - system change - regulatory or governance update - issue discovered during operations - owner-requested review ### 2. Confirm current document state Verify: - document ID - version - current status - owner - file location - related documents - next review date ### 3. Evaluate the document Review the document for: - continued applicability - accuracy - clarity - completeness - consistency with current business practice - consistency with related architecture, systems, and workflows ### 4. Determine review outcome Select one of the following outcomes: - no change required - revise and resubmit - supersede with a new version - retire document ### 5. Record review result Update the appropriate records, including: - `review-calendar.csv` - `document-control-log.csv` If no change is required, update the next review date and close the review cycle. ## B. Revision and Supersession Process ### 6. Create revised draft If revision is required, create or update the next version in the appropriate `drafts/` area. ### 7. Route for review Move or track the revised document through the `review/` state and gather reviewer input. ### 8. Obtain approval Obtain formal approval from the named approver. ### 9. Publish revised version After approval: - place the approved document in the correct `active/` location - update version and effective date - update the document register - log the transition in the control log ### 10. Retire superseded version Move the superseded active version to the appropriate `retired/` location and record the supersession in the control log. ## C. Retirement Process ### 11. Identify retirement basis A document may be retired because it is: - replaced by a newer version - no longer applicable - obsolete due to process or system change - withdrawn by management decision ### 12. Confirm retirement impact Before retiring the document, confirm: - no current dependency requires it to remain active - users can be directed to a replacement, if applicable - related records are updated - evidence of the retirement decision is captured when needed ### 13. Obtain retirement approval The named approver must approve retirement before the document is removed from the active set. ### 14. Move document to retired state Move the document to the matching path under `retired/`. Do not delete retired controlled documents unless a separate retention rule explicitly authorizes deletion. ### 15. Update records Update: - `policy-register.csv` - `document-control-log.csv` - `review-calendar.csv` as applicable ### 16. Preserve evidence Store supporting evidence in the appropriate evidence folder when required, including: - approval note - review outcome - supersession reference - retirement rationale # Outputs This procedure should result in one or more of the following: - updated active document - retired document - updated review date - updated registers and control log - retained approval or retirement evidence # Exceptions and Escalation If review cannot be completed on time, or if ownership, applicability, or replacement status is unclear, escalate to the Business Owner. If an active document appears unsafe, misleading, or materially outdated, it should be flagged for immediate review and may be temporarily withheld from operational use pending decision. # Review and Revision History | Version | Date | Description | Author | Approver | |---|---|---|---|---| | 1.0 | 2026-04-03 | Initial active release | Business Owner | Business Owner |